Civil & Infrastructure Estimating
Provincial and municipal spec roadwork in tonnes and square metres, granular base, curb and gutter, concrete storm pipe, PVC and ductile iron watermains, manholes and bridge takeoffs.
Technical Takeoff Scope & Engineering Overview
Municipal and heavy civil tenders need unit-price accuracy against provincial transportation specifications (such as OPSS in Ontario) and municipal standards: asphalt tonnage by lift, Granular A and B, manhole inverts, watermain restraints and traffic control. We take off in metric to match Canadian tender forms.
Governing Canadian Codes & Specifications
- Provincial transportation specifications (e.g. OPSS / MTO)
- Municipal engineering standards
- CSA A257 concrete pipe
- AWWA C900 PVC pipe
Software Operated by Our Senior Estimators
Sample Bill of Quantities Line Items (Civil & Infrastructure)
Excerpt showing itemized MasterFormat coding, metric/imperial unit quantities, and spec notes typical of our deliverables.
| CSI Code | Description | Unit | Sample Qty | Specification Notes |
|---|---|---|---|---|
| 32 12 16 | Hot-Mix Asphalt: 60 mm HL-8 Binder + 40 mm HL-3 Surface over 300 mm Granular A | m² | 12,200 | Tonnage at 2.4 t/m³ compacted + tack coat & line painting |
| 33 41 00 | 600 mm Reinforced Concrete Storm Sewer Pipe (CSA A257, 2–3 m depth) | m | 378 | Includes 19 mm clear stone bedding, gasketed joints & compacted backfill |
| 33 11 13 | 200 mm PVC DR18 Watermain (AWWA C900) with Restrained Joints | m | 564 | Includes valves, hydrants, pressure test & bacteriological sampling |
What You Receive
- Unlocked Microsoft Excel Estimate (.xlsx)
- Color-coded marked-up drawings (.pdf)
- Unpriced Vendor BOM spreadsheet
- Canadian postal-code calibrated crew rates
- Dual-estimator QA certificate
Provincial Hubs for Civil & Infrastructure
Specialized Civil & Infrastructure Scopes (15 Services)
Click any specialized service below to view itemized measured quantities, bid risk checklists, and local urban coverage.
Civil Estimating
Road Construction Estimating
Highway Estimating
Asphalt Paving Estimating
Concrete Paving Estimating
Bridge Estimating
Parking Lot Estimating
Sidewalk Estimating
Curb and Gutter Estimating
Drainage Estimating
Stormwater Management Estimating
Underground Utility Estimating
Sewer Estimating
Water Main Estimating
Pipeline Estimating
Civil & Infrastructure Estimating FAQ
Common questions about estimating civil & infrastructure projects across Canadian jurisdictions.
How much do civil & infrastructure estimating cost? ▼
What deliverables are included with a Civil & Infrastructure estimate? ▼
What software platforms do your civil & infrastructure estimators operate? ▼
How are Canadian codes and standards addressed in Civil & Infrastructure? ▼
Get Your Civil & Infrastructure Estimating Estimate in 24–48 Hours
Upload your drawing sets for a firm flat-fee quote in 15 minutes. Complete CSI MasterFormat Excel & marked-up PDF packages from CA$65.