General Construction Estimating Services in Ontario
CSI Div 01–48 material quantities, local ON crew wage hours, and bid-ready Excel packages calibrated to Ontario Building Code (OBC) starting from CA$70.
Local ON Scope Details & Technical Standards
General contractors carry the full scope risk: self-performed work, subtrade buyout, general requirements, bonding, insurance, site logistics and the 10% statutory holdback. We break drawings down division by division, check architectural against structural and MEP sheets, separate GST/HST/PST/QST correctly, and calibrate labour to the province and city of your project.
Software Operated for General Construction
Sample Deliverable Line Items (General Construction)
| CSI Code | Description | Unit | Sample Qty | Specification Notes |
|---|---|---|---|---|
| 01 50 00 | Temporary Facilities, Fencing & Site Controls | MO | 8 | Includes temp power pole, sanitary, perimeter fence |
| 03 30 00 | Cast-in-Place Foundation & Slab-on-Grade (30 MPa) | CY | 485 | Includes 10M/15M rebar, vapour barrier, pump & finish |
| 05 12 00 | Structural Wide-Flange Steel Framing (CSA G40.21 350W) | TON | 64 | Fabricated, primed, erected w/ high-strength bolts |
| 07 54 00 | 60-Mil Mechanically Attached TPO Roof System | SF | 18,400 | R-30 polyiso tapered insulation & flashings |
| 09 29 00 | 5/8" Type X Gypsum Board on 3-5/8" 20GA Metal Studs | SF | 26,200 | Level 4 finish, acoustic batt infill included |
General Construction in ON
Turnaround: 24–48 hours. Complete Excel BOQ & marked-up PDF drawings.
Upload ON Plans →Included General Construction Scopes
ILLUSTRATIVE STARTING VALUES — NOT RSMeans data. Labour/material factors below are internal planning estimates used to calibrate the starting fee. Replace with RSMeans Canada city cost indexes or local supplier/union rate data before presenting them as verified.
General Construction in Ontario FAQ
Clear answers about our Canadian estimation deliverables, turnaround, software and fees.
How much do general construction estimating services cost in Ontario? ▼
What ON codes govern this General Construction estimate? ▼
What deliverables will I receive for my ON bid? ▼
Can you accommodate winter work or remote mobilization in Ontario? ▼
Ready to Bid General Construction in Ontario?
Upload your drawing sets for a firm flat-fee quote in 15 minutes. Complete CSI MasterFormat Excel & marked-up PDF packages from CA$70.